PRF stage 50.00, final text or FDIS registered/ Estimated publication 18 February 2027/ ISO 30301:2019 remains the current published edition
30301ISO 30301 Revision CheckerThe records requirements, and the revision record
NORMATIVE ANNEX

Annex A: requirements, not guidance

Annex A is normative in ISO 30301:2019. It is where the operational requirements live: the records processes in A.1, the records controls in A.2 and the records systems in A.3. An auditor can cite it, and a gap analysis that stops at clause 8 is incomplete.

A.1 / NORMATIVE

Annex A.1: Records processes

The organization has to operate the records processes its business needs and keep them under control.

Read the record
A.2 / NORMATIVE

Annex A.2: Records controls

The organization has to put in place the controls that make the records processes consistent across the organization.

Read the record
A.3 / NORMATIVE

Annex A.3: Records systems

The organization has to provide records systems that keep records authentic, reliable, usable and protected for as long as they are needed.

Read the record
Why the label matters. In the 2011 edition the annex was structured around creation and control. The 2019 edition rebuilt it into processes, controls and systems, and the committee's comparison records that restructure. A procedure that still cites the old A.1.1 or A.2.5 numbering points at a different duty after the change.

The 2011 to 2019 crosswalk Clause 8.3, which points here

THE RECORD

The rules this is built from

Every line names its source. The 25 clause-level records and the 3 Annex A records for the requirements that apply today are written from the published ISO 30301:2019, in our words; the evidence and the common gaps are our reading, cited to the clause. The revision layer is read from the public ISO stage record and the committee's published comparison. Where the record is silent, the page says so. Read from the real rules, not invented.

25 CLAUSE RECORDS

ISO 30301:2019, clause by clause

Each clause page states the requirement in our words, the evidence, the gaps and what to do before the revision lands.

Open the clause index
3 ANNEX RECORDS

Annex A, normative

Processes, controls and systems. Requirements, not guidance, and each one has its own page.

Open Annex A
6 PROVEN CHANGES

What changed in 2019

The committee's own comparison of the 2011 and 2019 editions, with the old clause and its new home.

Read the comparison

The ISO 30301:2019 text is not reproduced. The ISO/PRF 30301 text is not public and is not reproduced. The record this site reads is linked on the standards page.